Service — Spokane, Washington
Electrical Panel Upgrades for EV Chargers in Spokane
Many Spokane homes — especially in older neighborhoods like Browne's Addition, South Hill, Indian Trail, Perry District — have 100-amp electrical service that cannot safely support a Level 2 EV charger. A panel upgrade resolves this, and the combined project can often be completed in one or two visits.
Do You Need an Upgrade?
Check your main breaker — if it says 100A, you almost certainly need an upgrade. If it says 200A with open slots, you likely don't. Full panel assessment guide →
Cost in Spokane
A 100A to 200A panel upgrade in Spokane runs $2,000–$3,500 including labor, materials, permit, and inspection. Combined with the Level 2 charger installation, total project cost is typically $2,500–$4,500.